Sounds of Construction in Malvern, part 5b


Things have slowed a little in Malvern since the last post; Chores on the home front and waiting for some parts.

I did manage to get started on the dust collection system.  I'm waiting for some parts to arrive so I can finish these and get the canopy built over the conveyor. 



I need to get a concrete pad in place, the motors placed on top, run some tubing into the building and then try to come up with some kind of a discharge chute so I can empty them into a truck.