Friday, October 20, 2017

Those Distant hills.

With the track all painted in Haskell it was time to step into some uncharted territory for me...backdrop painting.  I tried this years ago on some modules that I had built but was unsuccessful. 

Fast forward to the present.  I began building the current layout in 2007 and several years into I got a backdrop installed.  Soon after I got it painted blue and was pretty happy with it.  It stayed blue until a few years ago when I got some scenery installed in Malvern using the same basic technique of two tone hills.  

So the first thing I wanted to take care of was getting rid of the screws that I used to secure the backdrop.  I used panheads until I knew for sure what I wanted.  




I started countersinking some new holes close to where the old screws were at, then I installed new #6 x 5/8" screws with a countersunk head.  Then I puttied the holes up and sanded them smooth and touched them up with the original blue.




I had done a lot of studying of backdrops on the web.  I later stumbled across and started watching a blog by Eric, a.k.a. Pomperaugrr and his N scale layout based upon the modern version of the (HRRC) Housatonic Railroad.  He had posted a few updates of his backdrop that caught my eye. 

I like real backdrops but could never find anything produced that was close to what I wanted nor did I have the ability to go photograph the area I was modeling.  So I kept surfing....I remember reading somewhere that a backdrop should never be so good that it should distract from your modeling.  However I've never seen any photo backdrop do this.

After rummaging through a lot of pictures and "How to's" on the web I kept coming back to Eric's backdrops.  There was something about this simple method he produced that always kept drawing me back to it.  I think what I liked about it was, it had enough to give the scene depth but yet it was simple and not overpowering.  

My next step was to get some paint but I struggled for a while over which colors to get.  With help and guidance from Quin,  I found some paint sample online and decided to pick up a quart of each of the two colors I settled on.  I went a local Menards store and got the cheapest flat paint I could find.  I figured this should give me more than enough to finish the entire backdrop and then some. 




One issue I was having was trying to mix and match what I had previously done in Malvern.  Every time I mixed a batch it was always off a shade or two, so with the two quarts I should never have the troubles matching colors again.

I sketched out an idea of where I wanted the distant hills to go and grabbed the light colored paint and 1" foam brush.  I started with a Pittsburg color called Jaded Green.  This was green but has a blue tint to it.






Then I used the darker color, another Pittsburg paint called Deep Veridian, this has no blue tint. I started painting the nearer hills, because they were a cheaper paint I had to give both colors a couple of coats.








I was pretty happy with the results, even though the paint dried a few shades darker.

Next I wanted to try a tip that I picked up from watching a video that Dave Frary posted.  After he painted each set of hills, he went back using a can of white primer, added a mist of white over the hills he had just painted.  He said this helped to define and add a touch more of depth to the hills.












Saturday, October 14, 2017

Haskell's painted

After a little bit of digging I found my landscape paint.
Nothing special, something I found at the paint store that was mixed wrong and I got it for $1.  This helps to seal the ceiling tile when I start gluing down the grass base and gives a nice earthy look.



Once the base paint dried I got the tracks sprayed with a couple of shades of Rust-Oleum brown.




With a bit of cleaning I had the rails clear of paint and the test loco running nice and smooth!  Right after I sprayed the tracks, I wiped most of the paint off the rails with a rag dampened with mineral spirits.  Later I used a PERFECT track cleaner to get the residue paint off and polish the railheads and turnouts.

Now I can focus on the backdrop.  I think I'm going to start by installing new countersunk screw and puddy over them and fill in the seems.  If that works well, I'll start painting the hills and then the clouds.




  

Wednesday, October 11, 2017

Preparations for ballast and backdrops.

With the session behind me, I started getting an itch to do something other trackwork. 

So I picked an area that I knew was pretty much ready for scenery and started prepping the tracks to paint and then ballast.  Man it's been awhile since I've done this last and had to stop and think of the process.

The first thing I did was to trim the excess cork back to the edges of the ties.  I've always trimmed it back as I'm not a fan of a wide roadbed, especially since this isn't going to be a well maintained and manicured line. 




Then I grabbed some old flex track and started cutting sections of ties to fill in the joints where they were missing.  It's amazing how much better this makes things look.
















Next will come the painting of the track.  Again since this will be an older less maintained track, I didn't want to use a darker brown paint for the tracks.  I want it to have more of a look like sun faded rather than a fresh look.  So I found can of  Rust-Oleum Bronze.  It's actually not far off from Floquil Rail Brown, but it is a bit lighter.

I'm also going to use a custom blended ballast starting with a light gray.  So I don't want the track to be too dark so it stands out in the lighter ballast.  If this winds up being too light I can always tone it down with washes or powders.





Once I get the track painted and ready for ballast, I also want to continue working on the back drops.  I want to replace the screws with countersunk ones, putty over them and fill in the seams, then I can continue painting the hills. I'm also itching to try a different technique for making clouds that I've been researching.  





Sunday, October 8, 2017

Op Session #14

Session #14 is in the books.

Overall it went very well, and didn't encounter many issues.
Then again we didn't have a full complement of crew, only about 4 at one time. So none of the through freights even left the staging yard.

Here are a few pics that I did manage to catch, but got too involved to get many more.

Train LRMP-W on the north end of Haskell.



After setting out the cars at El Dorado, LRMP-W passes the new house track at Ruston.



MPLR-W  just left the yard and heading north through Winnfield as it swings onto Tioga Jct.



The MPLR-W has just shoved it's setouts on the A/D tracks



Once the work is done, MPLR-W crossed the Ouachita River Bridge and throttles up.



I don't recall having any shorts due to locos shorting out on the PECO turnouts, a few did occur which were crew errors, me included.  Quin had a difficult time with a few new BLMA flat cars that was were thrown into service for the new industry at Ozark Irrigation.  I do believe that can be chalked up to the fact of BLMA wheels and the turnouts they were picking were in the yard at El Dorado, turnouts I that I did not shim?  I guess I'll look into doing that.

As for the track work re-alignment that I worked on all summer and since last November, I am happy to report that reports came back from the crews that the track work was good and smooth and ALL is good on that front!  So I now feel confident to start on some scenery, just not sure where?

Quin started out working El Dorado with the two new SW-1's I picked up.  While I was testing them before the session with good results, he was having issues with them stalling quite a bit.  So he switched back to the ex Rio Grande GP7 and had much better results.  Well after the session was over with I went back down to clean things up and decided to try the pair of SW-1's again.  I had no issue with them what so ever?  So it must have been that the tracks were still a dirty and got cleaned off by the time the session was over?  I'll keep playing with them for awhile l before I decide what to do with them.

While we didn't have many shorts in the main staging yard, I will say that in the 11th hour I picked up some cheap clear nail polish and painted the rails on the Atlas turnouts as I did have a few shorts beforehand.  I know this only a temporary fix, but there has been some discussions in my head with the inner voices about ripping up some if not all of the staging yard and redoing it with a better design?

This yard started out as nothing more than a staging yard for our expanding Bend Track modules back in the day.  The last time I rebuilt it and re-laid the track was in 1997 just before we went to the NMRA national.  After that show it was never used again until I started building the layout.   I made some minor modifications so that the whole yard wasn't a giant reverse loop and it has worked very well since, even with the old Atlas turnouts I used.
Thoughts will continue on this....

The upgrade from the Simplex to the Duplex system worked just fine and no one complained about NOT having to plug and unplug the throttles to gain or release control of the consists.  It was actually a pretty nice feature.

Due to not having a full complement of crews on hand, the Job Board and Seniority System was not implemented, however I think this will work if needed.

This brings me to an issue that has been chewing on me for a while now.  I've been toying with the idea of tearing down the layout, well at least paring it back to a more manageable size?  I know I wouldn't want to make it any bigger, but smaller is looking kind of nice lately?

There are several reasons for these thoughts.
1) Maintenance.
2) Work to get things setup and running
3) Maintenance.
4) Lack of being able to get anyone over to run an operating session.
5) And a number of other minor things.

While getting things up and running for this last session I needed to go back and re-program some locos, clean a few and adjust several cars.  I know this goes hand in hand with any layout, but this is, at least to me, a fair sized layout that can and does take a bit of work to maintain.

Now with that said, I do think I have passed a point of the major building and after all the work that I've done over the last year I may just be a bit burned out?  But I do not see myself without a layout, I'm just too much of a busy body not to have something to work on in my spare time.  So I've been toying with the idea of paring back the layout to a more manageable size, one where I could play trains by myself and if I can still get 3-4 others (mainly the core crew members) together once in awhile it might still be worth doing.

Even still, the layout will still need to be much bigger than a small peninsula or HCD layout.  If I can't do ops, then I will forego that idea.  Over the past year I have seen some very nice HO scale layouts that take up a bedroom of at least 10' x 10' and they've been geared towards operations.
But I just don't know if I can handle something that small without getting bored running in circles and having much shorter trains.
Decisions, decisions.....

I do know that I've had to cut back the length of my trains from when I first designed the layout, but looking back at that decision over the last 4 years, I have not regretted it.  In a way, shorter trains seem to work much better just due to the physical forces that are put upon them while switching.
Originally I had planned for around 25 cars per Local, but had to cut them down to 15 cars.  Now looking at working them during a session, it feels right.  

I know with a layout of my size and limited crews on hand, we can still operate and have a good time. What the four of us did this time was to just run the four manifests that feed cars to El Dorado yard where they're used to built the three local turns and get them sent on their way.  None of the Through trains even moved from the yard.   Which seemed to work out very well and was very relaxed?

And maybe this is what I need to focus on, maybe this is my answer?   Continue on the layout as planned, and when an op session is called for and only gets a small number of crew from now on, piss on it!  We'll just run the basic trains and work the locals in a relaxed manner and have fun?

Maybe I just need a bit of a break as well?






  



Monday, September 18, 2017

I can't see the damn tabs!

One issue I had with the tabs right after I first switched over to them was with empty open hoppers and empty woodchip hoppers.  I had to sit the tabs in the cars and this meant on the bottom of the cars.

May not seem like too big of a deal, but when the layout is set at 52", some of the crews couldn't seen into the cars, some had to stand on their tippy toes.

From my normal eye view


Standing on my toes.



This issue would pop up while staging and then during a session but was forgotten about soon after the session.

Well with the next session just around the corner, I decided to try and find a solution to this issue.  I thought about making some sort of a bridge from plastic or wood that could sit across the top of the hoppers. I also thought about using some of poster putty to hold the tabs in place?  All seemed to be more work than I wanted.

Last night I came up with a little something that might work? 
I spied one of the clear plastic covers that come in the MTL jewel cases.  The nice thing about this was it was clear and wouldn't stand out more than the tabs do.

So I cut a small section off and bent the ends down so they hung over the edges and placed the tab on top.  Not bad, but kind of bulky and the tab wanted to slide a bit.



So I kept playing around with this.  Pretty soon it hit me, let's make it narrower so the tab straddles it like they do over a roofwalk?




This seemed to work OK and it was much smaller, plus the tab couldn't slide around either.



So for now I think I'll give this a whirl and see how they ride throughout the session?  And like Steven said, if anyone knocks them off due to some rough switching, I guess that crew earns a turn to wear the Asshat award.








Friday, September 15, 2017

Pipe loads complete

Tonight I finally got the pipe loads completed for Ozark Irrigation.
I still need to get some strapping installed on the pipe, but at least I'll have some loads for the session instead of using our imagination.











Tuesday, September 5, 2017

Pipe Loads

Made some good progress today.  Labored on Labor Day.

I finished getting the cars staged and tabbed.
I got all the extra cars moved off the layout.
I re-typed some of the Train Instruction sheets and added the new industries.
Removed some of the passenger cars from the two Mail trains and added a few extra TOFC's.

Then I started making a few pipe loads for the flat cars that will serve Ozark Irrigation.



A few years ago I picked up a slug styrene round and square tubing from a seller on eBay called kdarr70.  He sells a lot of different types of styrene in bulk a lot cheaper than you can buy it from Evergreen or Plastruct.





Monday, September 4, 2017

Closing in on Op session 14

Last night I got off to a rough start staging the layout.  I generated a new Wheel Report and after getting the biggest share of the cars staged and tabbed, I noticed that something wrong.  On one sheet was calling for 14 cars, but on another version of that sheet, it was showing 13 cars?

So I opened the spreadsheet and starting digging through it.  Found it!  One of the sheets wasn't summing up all of the cells becuase I had added a couple of lines to one sheet and not to the other.  I can see now how important Copy & Paste is going to be with this.

Next I came across another issue, one sheet was incomplete.  I must have started working it over and never finished it or simply missed it. Grrr!  After about an hour or so I got things in order and went back down to finish staging the cars.  So we'll see how things work out in this session.

I still have a bunch of small time consuming things to do:

  1. Finish getting the Town schematics printed off, these will show where to spot the cars since I don't have a lot buildings in place yet.
  2. I need to re-do some of the train instructions so that they match with some of the new industries I've added.
  3. I've got a bunch of stuff strewn across the layout that I'm planning to sell on eBay and/or the forums.  I found a huge box of older Atlas turnouts and snap track that I have no need of.
  4. Clear off the workbench and get it cleaned up.
  5. I need to get the throttles out of the box and get them ready to go.  I have only pulled out a couple to play with since I got them back from Digitrax and having them upgraded to Duplex and also need to get the batteries charged up.
  6. I need to change out a few 48" fluorescent bulbs.
  7. I still need to double check the Locomotive consists and make sure they're still running properly
  8. Clean the tracks, again.....
I'm sure there are a ton of things that I'm not thinking of?

There are two things that I want to add to the Ops, one is the new Seniority Status for assigning or choosing the jobs on the layout.   This will based on a "per session" basis rather than "accumulative" basis for now until we see how it works.

The other thing is I plan to split the El Dorado Yard Job into two shifts.  There are 8 jobs per one full session that the crew has to deal with.   This way the crew isn't tied to the yard job the entire session and it creates another job.  

With me being off work for a month due to a minor leg injury, I'm hoping I will have more than enough time to get things done in a short order.  I'm itching to get the trains rolling and see how the new track arrangements and industries work out.