Monday, September 4, 2017

Closing in on Op session 14

Last night I got off to a rough start staging the layout.  I generated a new Wheel Report and after getting the biggest share of the cars staged and tabbed, I noticed that something wrong.  On one sheet was calling for 14 cars, but on another version of that sheet, it was showing 13 cars?

So I opened the spreadsheet and starting digging through it.  Found it!  One of the sheets wasn't summing up all of the cells becuase I had added a couple of lines to one sheet and not to the other.  I can see now how important Copy & Paste is going to be with this.

Next I came across another issue, one sheet was incomplete.  I must have started working it over and never finished it or simply missed it. Grrr!  After about an hour or so I got things in order and went back down to finish staging the cars.  So we'll see how things work out in this session.

I still have a bunch of small time consuming things to do:

  1. Finish getting the Town schematics printed off, these will show where to spot the cars since I don't have a lot buildings in place yet.
  2. I need to re-do some of the train instructions so that they match with some of the new industries I've added.
  3. I've got a bunch of stuff strewn across the layout that I'm planning to sell on eBay and/or the forums.  I found a huge box of older Atlas turnouts and snap track that I have no need of.
  4. Clear off the workbench and get it cleaned up.
  5. I need to get the throttles out of the box and get them ready to go.  I have only pulled out a couple to play with since I got them back from Digitrax and having them upgraded to Duplex and also need to get the batteries charged up.
  6. I need to change out a few 48" fluorescent bulbs.
  7. I still need to double check the Locomotive consists and make sure they're still running properly
  8. Clean the tracks, again.....
I'm sure there are a ton of things that I'm not thinking of?

There are two things that I want to add to the Ops, one is the new Seniority Status for assigning or choosing the jobs on the layout.   This will based on a "per session" basis rather than "accumulative" basis for now until we see how it works.

The other thing is I plan to split the El Dorado Yard Job into two shifts.  There are 8 jobs per one full session that the crew has to deal with.   This way the crew isn't tied to the yard job the entire session and it creates another job.  

With me being off work for a month due to a minor leg injury, I'm hoping I will have more than enough time to get things done in a short order.  I'm itching to get the trains rolling and see how the new track arrangements and industries work out.








No comments:

Post a Comment