Olin-Chlor expansion, part 7


OK I'm back on track with the Olin-Chlor expansion project! I got the Tomytec towers  assembled and ready to install.

                           


They are probably not the best or greatest detailed kit, but with a little bit of cutting, trimming and filing, you can get the joints to fit a lot better than if you did nothing to them. Before the final assembly, I painted everything that was going to be silver with an Oxide Red.  Then I went back over them with a misting of Old Silver that I tinted down with black.  I sprayed on just enough to cover the majority of the Oxide Red to make it look like the silver is wearing off.  This is probably all the weathering they'll get for now.

Now that I had these done, I was able to play "Musical Buildings" and see how things would fit in the given location so I could get the concrete pads located. While doing this several things came to mind and changes were again made on the fly.

I decided to concrete the entire area in Olin-Chlor and then build up separate pads for the pipping cage and for the two cooling towers since the distillation towers already had their own pad.  

Next the building went under the saw again for the second time since I started working on it.  The first time I cut it down in depth.  I had actually given some thought to abandoning the building as I thought it was going to be too big for this location, but as I was moving things around, the thought occurred to me that maybe if I place a building flat behind it it wouldn't look like it was just plopped up against the backdrop, maybe give it some depth?  It just stuck out too far and everything looked to square and symmetrical.

I decided to cut it at an angle so that it was closer to the angle of the tracks.  This did two things for me: it took away some of the mass and it also gave me more room between the loading platform and the tracks which I could now fit a truck against the loading dock without using a shoe horn.   Since I cut the building at an angle, I did forego the idea of a building flat behind it as it would be hard to replicate a printed flat to match the angle.  It also made the area look a bit larger as it wasn't lining up with the walls or fascia. 

Another idea I came up with was something to hide the 90° vertical corner. Several weeks ago Steven and I was talking about getting some of the tall smoke stacks that are available from Tomytec for use on his layout.  I figured that I could use one to hide the corner, but they weren't as tall as what I wanted.  I wanted something much taller. Last Saturday while Quin and I was at lunch we ran over to Mynards and went to the plumbing department to look for some PVC pipe and fittings.

$3.05 later, I came home with these:



The two rings in the foreground we cut off one end of the coupling sitting next to it.  This was done to make a couple of rings around the stack, and came up with this.  Now it was much taller than I needed but it did the trick of hiding that corner!



Now with that covered I needed to find a way to concrete the entire area.  I didn't want to pour plaster in that big of an area, so I ran to Home Dumpo and picked up another NO PARKING sign made of styrene.  This one was a bit thicker than what I used to cover the building with and it was much larger, 15" x 22".  After getting it cut and fit to the area, I taped and glued the joints, then using a score I made all the concrete expansion joints at 15' squares.  I slightly angled the squares from one area to the next so it looked like multiple pours had been made over time.  

I stripped everything out the way and prepped the area.



Got the No Parking sign cut, fit and glued together. Got the building cut at an angle.  Got the Smoke stack sized and glued together and then started to set things in place.




Once this was done I sprayed the concrete pad with a spray bomb of gray primer but it looked too clean and too perfect, I wanted it to look like it had a little age. Next I sealed it with Dull Cost and wiped on a wash of India Ink and then blotted it off the excess with a napkin.  Greg, Steven and Quin all thought it looked like a big Marble parking lot!  Plus it was a little darker than I wanted.





The small platform for the cooling towers was painted with Polly Scale Aged Concrete, the building was painted using Floquil's Concrete and the concrete is the gray primer with the India Ink wash.  Looks like Greg, Steven and Quin was right.  A Marble parking lot?



So here is what I ended up with:




The next day I grabbed a bottle of Polly Scale "Aged Concrete" and ran over to Slobby Lobby with the hopes that I could pick up a some cheap acrylic craft paint and mix something closer to the Polly Scale.  I had given thought to breaking down and buying some the Woodland Scenics Concrete paint, but I just had the feeling that what they offered was nothing more than the same cheap paint at four times the price!
I did manage to come up with a decent match.  I don't recall what colors I used but I started with a gray and a beige that got me close.  Then I added a few drops of yellow and a couple drops of black. It came out very close to the Floquil Concrete, the same color as the building.

I'll try to get some shots of the paint colors in the next post as well as the concrete pad.   It's good to make some progress again.

Edit: Click here to jump to "Olin-Chlor Expansion part 8"




Tuesday, February 3, 2015

The traveling NSN observation car.


This morning I heard over the squawk box that some private varnish was suppose be trailing behind Amtrak's Rebel.  So I made a few phone calls and got the skivvy from some of the local railfans.
The Rebel leaves Alexandria around 9am so it was going to be an early morning for me.

After arriving in Alexandria I hit the local Quicky Mart to grab me some foamer snacks for the day then headed for the yard.  Within 10 minutes I heard that the Rebel just left the station and I caught up with her passing the house tracks. Sure enough, there was the private varnish just as expected, but what the?  The Gargoyle II?  Oh well at least it was something different to shoot for once.




I snagged one picture and sped out of the yard and headed for the diamonds at Winnfield to setup. No sooner than I got set up I could hear the Rebel nearing my location.




Another short jaunt down the road I and came to Ruston hoping to catch it again crossing the ICG diamonds this time. Made it just as it passed the tower.  If they keep their speed down this morning I might be able to keep up with it and get several pics before it leaves El Dorado?




I did manage to get a bit ahead of the Rebel this time. I caught it as it begins the swing into the big "S" curve on the north end of Dubach.




After Dubach they must have hit a slow order something as I made it to El Dorado with a few minutes spare.  It's a grab shot as it enters the yard limit, but what the hey?  Just as I got over to the depot to get a closer look, I found them spotting it on the house track, Really?







At first I thought they might have a bad order or something but when I asked the agent, they told me that their plans had changed and the passengers decided they wanted to take a detour over to Hot Springs, AR for the night and enjoy the National Park.  Awesome, that could only mean one thing!

The W&OV will be coming to down to El Dorado to pick up the car.  I wonder if they plan to tack it to the end of the daily Razorback and return to Malvern with it?  Oh this is going to make for some cool shots!  ALCo's on the point and private varnish on the rear!

Knowing the Razorback isn't scheduled to shown until 1pm or so I decided to go and grab a soda.  Just as I got back and parked the truck I heard the horn of the W&OV just north of town as it crossed the Ouachita river bridge.  But it's too early for the Razorback?

A few minutes later W&OV #2073 pulled down the passenger siding and eased up to the varnish and made the joint.  Much to my amazement they wasted no time in getting under way!  






I grabbed my gear and jumped in the truck and headed north to follow them.  I caught up with them at Calion just as they took the siding.  Ah, they must have been in hurry to get here so they could meet a SB?





Sure enough, no sooner than they closed the switch I heard a horn coming south through Fordyce.




Once the LRMP went past, the 2073 slowed to a crawl as they rolled down the siding only to come to a full stop on the north end of MQ siding, another train? Yep!  This time it's the SB Katy coal drag that is heading to Baton Rouge.  Well this would explain the rush to get out of El Dorado.  MQ is the only siding between El Dorado and Haskell.




Once Miss Katy cleared, the 2073 resumed north to the junction at Haskell.





With the Riceland elevator as a backdrop, I snapped another shot of 2073 in the junction siding.




I caught up with her again as she entered Malvern then again as she rolled past Heavy Metal and Crushmoore, Ind. 







By this time it was getting late and there wasn't many more good shots to be had before they reached Hot Springs so I called it a night.  On the way home I stopped by the W&OV shops and found Homer and asked him when they were coming back through?  As he scratched his head he said "Maybe in a day or two, wasn't too sure, but I'll give you a call when I find out, iffins you'd like"?.

On the way home I got a call from Homer saying that the group had decided to stay in Hot Springs for a full day and return the following morning.

Two days later Homer called me again to say they had a schedule on the varnish. "Gonna be in Malvern heading back to El Dorado later that day and that if I hustled I could catch it leaving Malvern around 11 am"

Just as Homer had promised I caught the 2073 doing the honors again, this time near Crushmoore.


Then passing Frump Gas near the Haskell Jct.




At haskell they had to wait for another SB grain train before entering the main.  
Cool!  A Rio Grande SD45! Normally I see more more SP power but this was a nice catch!  After getting clearance, they hustled through Fordyce, this time they didn't need to take the siding so I lost them.





By the time I reached El Dorado the switcher came out to meet them and looks like they're going to snag the car off the 2073 on the main and spot it on the house track with the 4206.  Looks like the 2073 will return to Malvern light, too bad I couldn't sweet talk a cab ride? 








A short time later the Rebel arrived in town and backed onto the varnish.  Again, wasted no time in departing.



A friendly wave and they were off.





The next day, a buddy called me and said he got some good footage of the Rebel running through Haskell with his new video camera.








Sunday, January 25, 2015

Ops session #10


After having two dry runs of the Tab On Car system behind us, we decided to have a full blown session with the tabs.  I've been itching to do this soon.

Several weeks ago I got an email from Coy Coles who lives in Olatha, KS.  He contacted me about my layout, the main yard specifically.  He's in the planning stages of his layout that will be following the White River route of the MoPac from KC to Little Rock.

His plans are pretty much complete but he's been pondering his main yard and how to tie it together. While searching the web for ideas he stumbled across my blog and found pics of my yard.  It seemed to fit the bill so he contacted me and asked if there was a chance to see it in person.

Long story short, he planned to go the Great Train Expo in Council Bluffs and I told him to stop by afterwards and we'd kill a few birds with one stone.




After chatting a bit and inspecting the yard, we decided it was time to start the session, Coy sounded enthusiastic.  He wanted something easy to start with so I gave him the throttle for Riceland  and told him to gather up the outbound cars and get them ready for the Haskell turn.  Having completed this, I gave him the W&OV job at Malvern,  After a quick explanation of what he needed to do here, I left him alone to go about the task.  Every now and then I stopped by to see how he was doing.




Just about finished.





Meanwhile, Jon can be seen waiting for a Northbound Rock Island freight to return to Little Rock. The caboose is just passing through Fordyce.




A bit later, Jon took control of the NB Amtrak Rebel, seen here leaving Alexandria.


  

Somebody's Happy!
Hammering the diamonds at Ruston at speed.





After completing the entire Malvern job, Coy was eager for the next job.
This time he's working the Haskell turn at Haskell, AR. having picked up the loaded hoppers from Riceland, he's about to back the empties into the place.



That jobs done!  Now to tie the train back together and head back south to Fordyce to work the Flappers plant. 





Awhile back Steven told me about one of the layouts that he has a chance to play on, they have sort of a tradition where if you screw up you get to wear a 3' Sombrero, known as the Sombrero of Shame.  You wear this until the next person earns the right to wear it.  I always thought this would be fun to do, so after some pondering, Quin and I came up with our own.  The Asshat!

It was introduced tonight and Quin was the first to wear it!


Then Jon got his turn.


I'm not sure, but I think he rather enjoyed it?

All in all it was fine, fun afternoon!



I also tried something else out this time.  Ever since I installed the foam floor mats a few years ago, I was getting a lot of static electrical discharges during the winter months. Nebraska can get real dry in the winter time and very humid in the summer time.  I think this was the main reason that I've been having so much trouble with the decoders resetting to slower speeds randomly?  Everytime I touch the rails I'd get a good shock.

Friday night I picked up a small humidifier and also grabbed a can of Static Guard to spray on the foam mats.  The first thing Quin noticed was it didn't seem to be as dry as it has been in the past.  I told the guys to keep an eye out to see if they got any shocks tonights and none of them experienced any!   Maybe I finally got the gremlins under control?

While restaging the layout Wednesday night, I found about 20 locomotives that I needed to go back and  reprogram as they were all running at the reduced speed again, grrrrrrr! After two nights and about 6 hours of work, I got them running pretty much back to the normal settings again.  The only problem I found this afternoon was one U30C dropped out of consist.  I'm keeping my fingers crossed that this takes care of the problems?

I still think in time I'm going to replace the two PM42's I have with PSX units. 







Wednesday, January 21, 2015

A long journey


On the way home tonight I made my usual side trip through Biddle yard, this time I found #4446 shoving a few cars around, so I stopped and watch for a few minutes. After pulling back from grabbing some cars I was treated with to a view of an old dog that had obviously seen a rough life. What a sharp contrast between the car and the fairly clean GP!



A few minutes later after the crew had finished up, I caught up with one of them and jokingly asked if it was headed for the scrapper?
He gave me a half smile and said   "Nope, it's bound for the W&OV in the morning.  I think the tag says Effin Recyclers in Camden?"

Well that kind of got my curiosity built up and I asked if I could see the lading. Sure enough, Camden, AR. "But what's this" I asked as I pointed at the routing? I handed him the papers and said "It looks like it was routed from Germany? That can't be".
He chuckled and said  "Yeah, it's the damndest thing, ain't no one can figure that one out.  Nearest thing we could tell was some joker was bored and had nothing better to do".

We chatted for a few more minutes and then he decided he'd better get back to the shops before he missed his break altogether, I told him thanks and and we exchanged a nod.

Hmmm, Germany?  I'm gonna have to pull out some maps when I get home and see if I can find a town named Germany or something close to it.

*****



I wish to extend a word of thanks to my friend Mike Holly from the Elizabeth Oak Branch blog.
I've been in contact with Mike recently and have exchanged quite a few emails with him over the last several months or so.  Some of which were on weathering tips.

Mikes been doing a fine job on some of his Cleveland & Eastern RR locos, not too mention his layout, stop by and check them out.

Mike informed me that a package was heading my way shortly and to keep and eye out for it.  The other day it arrived and in it was this car!   Mike asked me if I could find a home for it on the Little Rock Line.  Mike, It'll fit right in, thank you very much!

Hmmm, Germany.  I guess the papers were right?






Tuesday, January 20, 2015

Let's try this again, shall we?


Today the two Tomytec distillation towers arrived.  I'm hoping I'll have better luck with these than those  #$@^%*   Walthers towers!





I actually think these will look better at a chemical plant. Once I get these done I can finalize the footprint for the Olin-Chlor plant.

Edit: Click here to jump to  "Olin-Chlor expansion, part 7"




Tuesday, January 6, 2015

A bit of a set back at Olin-Chlor


So far the Olin-Chlor build has been kind of taxing for me.
I have never really studied any kind of chemical plant before so I'm flying by the seat of my pants here.
First it sits in a corner and there is not as much room as I have envision, but when is there ever enough room?

I've made lots of changes throughout the planning stages of the Olin-Chlor plant. I've added things here and decided against this or that. I've done away with the idea of using the Walther's big storage tanks as they are just too big and not really what you'd see at a chemical plant. Instead, I've always loved piping so I decided to try my hand at building the North Island refinery kit. 

So I dug out the kit, read all of the instructions, studied it carefully and began the build.  Well the first thing I noticed about this kit was the lack of instructions, or the lack of any written instructions!  I started with the burn house or burn unit and got it together with a one small problem but got past it. Next came the piping cage.  Well this was turned out harder than it looked but again I persisted and got it together reasonably close to the picture on the box.

I managed to get the both portions built, painted and ready to set in place.  Then I started on the towers.

The towers themselves were OK, I also got the railings assembled to the platforms just fine and then got them painted.  I thought to myself, "Hmmm, even with the lack of instructions this was going to be OK.  Slow, but OK".

Well then came the moment of truth.  I started to attach the platforms to the towers.  Trying to decipher the actual locations for each of them turned out to be like ready a foreign language!  The instructions (or the lack of) just showed one view with lines pointing to where they should go in an exploded view.  To compound the problem,  there were a lot of platforms each with their own lines. Some of the lines themselves were dotted or dashed and in some places the lines overlaid each other!

So I started at the bottom and tried to work my way up, so far so good.  I got the obvious ones done first and added some of the small caps and valves as I went so I didn't have to reach in around the platforms later.

One of the first things I noticed was there wasn't enough of the caps and or valves for all the holes on the towers.  WTF?  I figured oh well, you'll probably won't see most of them anyway and proceeded.

I had about five of the platforms attached using a new tool I picked up recently that has a small needle for applying liquid glue that worked fantastic, you can apply just a drop at at a time.  I also had picked up some of the MEK which also works great.  When the time came to attach a platform that would be glued to three of the towers is where things went south.

Nothing really lined up as I had hoped or like the instructions shown.  Several of them I had to actually enlarge the inner diameter so as to fit the towers.  Once I got them to fit reasonably well, I located them and applied the MEK.  In the process of  holding and gluing the platforms in place, things slipped out of my hand! When I went to catch it before it made the plunge to floor, I crushed it against the bench and pieces went flying everywhere!

Sitting there trying to contemplate what just happened and uttering some profane syllables to myself, I looked at the instructions and what was left of the towers and platforms and decided at that time, Walther's kits are not very good kits like I had always thought they were.

In the next split second, what was left of the towers and platforms met Mr. Trash can!  Then, I calmly picked up the misc pieces and placed them in the trash as well.  I cleaned up the workbench, shut the lights off and made my way upstairs.  I jumped on the computer, called up my old friend Google,  and started looking for something else I could use in place of the now crushed pieces that made up the towers.

What I came across were the Distillation towers that are made by Tomytec.  I have seen these before and thought about getting a few for Olin-Chlor but since I had the North Island refinery kit I'd just use these.  I also had thoughts about picking up the entire Tomytec plant, but just couldn't see paying around $175.00 for the kit?  The two towers are on the way from Japan as I type this.

Now I have always thought that Walthers made some pretty good kits.  I had good results with the Vulcan Mfg kit, along with several others that I've build over the years but this refinery kit just blew dogs!  The instructions were very poor, the pieces didn't fit together very well at all and the fact that there wasn't enough pieces to use just pissed me off.

I've seen lots of modelers that have built this kit, so my hats off to them for getting through it.  I'm no slouch when it comes to models,  I've built tons of model cars and military vehicles through out my life, but this one juuuuust sucked!

I have a pile of these Walther's kits stacked up for the layout that I've picked up over the years and I sure hope they go better than this one did.
Maybe this one of the reasons that a lot of guys scratch build what they need?   

OK, my blood pressure is back down to normal and my rant is over.  I'm waiting for the Tomytec towers to arrive.  The two little cooling towers are from the same chemical plant and those went together very easy, so I'm hoping that these distillation towers will be much the same.

Edit: Click here to jump to "Let's try this again, shall we?"



Wednesday, December 17, 2014

Tab On Car update


We held the second dry over the past weekend and everything seemed to work out just fine.  We had one car picked up mistakenly, some of the Off Spots from the first session got tucked away this time and still had some that needed to be Off Spotted again this session.

Calion Lumber wound up only having one car to be dropped off.  If you recall, on the first run Calion Lumber didn't have any that were called for pickup.  There were already four cars filling the tracks and there were three cars that needed to off spotted there.  Since we didn't have enough room for one more car, the crew just picked up one of the cars that was sitting there from before the first run and the rest got shuffled around.

At Malvern, the W&OV crew wound up with a total of 5 or 6 cars that were slated as Off Spots and they were left sitting on the mainline between the engine house turnout and the East end siding turnout right next to the engine facility and Olin-Chlor.  If too many cars are Off Spotted at malvern, there should be plenty of space for these if the small siding next to the mainline at Haskell gets used, the one that leads to Ghuntz Ind.

I worked the yard at El Dorado this time.  Quin was right, the tabs made it very easy to shuffle cars around and not get lost by having to look between the cars and the switch list.

We didn't have any problems with mixing the Blue and Yellow tabs in with the White pick up tabs either.  Quin just reminded that ANYTHING with a tab at an industry gets picked up.  Once all the cars returned to El Dorado and got mixed in with the rest of them, it was easy to collect the Blue and Yellow tabs together so they could be segregated into their own group for ease of pulling from for the captive service cars next time.

So the decision has been made to keep the tabs!   
Now all I need to do is to work on adjusting the spreadsheet and the flow of cars and try to keep things somewhat even.





Monday, December 1, 2014

Modifying my tabs and labels


After the dry run of the Tab On Car system a few weeks ago, I encountered one problem.  When I was setting out the White Pool Track tabs for the captive service cars I ran out.  So I used the tabs for the cars final destination for that session.

Pool Track cars are captive service cars that do not go back to the main yard. These are the tank cars and pulpwood flats that run between the ICG junction at Ruston and Ohlin-Chlor and Crushmoore at Malvern. Then the open hoppers that originate at Gritty Gravel at Malvern and go to A&A cement at Dubach and back.  

Since they ran at such times that they would not catch the proper trains that could deliver them to their final destination for the current session, they would layover in the yard at El Dorado and will move on the next session.  So they were segregated onto a track in El Dorado that we called the Pool Track which kept them separate from the other through cars for easy sorting, hence the PT designation on the tabs.

What we came to realize, by that using the final destination tabs, the cars can now sit in El Dorado mixed in with the other through cars and are easily distinguishable to the El Dorado yard crew when they are sorting them.  So I asked Steven to make me a few tabs for these cars;

BLUE tabs for ICG & AAP
YELLOW tabs for OC, CP and GG2 
I also asked him to make some more NB and SB labels as well.

We'll see how this plays out on the next session.  The only confusion this will add to the road crews will be there are not JUST White tabs to pick up now, there will also be a few YELLOW and BLUE tabs to grab as well.  I think most of the guys know these cars are captive service and shouldn't have much trouble remembering this?  We'll see...

Now I need to get some kind of marking on the layout for the industries so we can easily match the tabs to them.