Wednesday, October 14, 2020

Staging renovation

Along with the reduction of my operations, the staging yard will also be reduced.  Not in physical size, but in the amount track that will be needed.

As mentioned several posts back, I plan to reduce the amount of trains that run during a session from as many as 22 down to 4.  This will include one local that runs out and back over the entire layout and only two through freights. 

The new staging will still function the same as the old staging, but will have much less track and be less complicated to operate.  The trains will enter and exit the staging as before as an extension of the layout, but will only have 4-5 tracks that make up the bulk of the yard.  A small basic engine facility and at least two tracks at the rear where a couple of through freights can sit out of the way.

In time, if things pan out my plans are to add a small industrial area between the yard and the rear two staging tracks, hopefully giving the illusion of a downtown scene.  This should also give me another mini switching layout within the overall layout to play on without having to run the entire layout.

A little history of the staging.

back in 1986 when we first came up with our BendTrack modular plans we wanted a staging yard where we could make and break trains without fouling the mainlines.  The first one was 8' long and 9 tracks wide.  After the first few public shows it was obvious that it was going to have be expanded.  The first expansion was to lengthen it from 8' to 16', the second expansion came a few years later.  I added a bubble on the end and looped the track 180° and wound up with 8 staging tracks and one return track.  This worked until 1997 when I doubled the width of the yard from one yard with 8 tracks to two parallel yards of 8 tracks each.  I also included two By-Pass tracks that ran between both yards.  I also added a bunch of ready tracks where the members could store their extra power if need.

In 2008 when I decided to build the current layout in the basement, I included the yard module for the staging of the new layout since we weren't setting up the modules any longer. Over the years I've made several minor modifications to it so it would function better in this new role.

As of tonight I took the time to clear it off so that I can start the renovation process.

 


Here is a rough drawing of what it will become when I'm finished.



The local is planned to originate and terminate in this yard.  The cars will be pre-staged into a SB and a NB group on two of the tracks.  The locomotives and caboose will be stored on the tracks within the loop on the right.  The two through freights will be staged on the green tracks in the rear (in opposite directions).  The industrial section is in blue if and when it gets added.  Disregard the red X's for now.

The session will begin with the crew pulling the locomotives from the engine facility and placing them and the caboose on the SB group of cars.  They will leave the yard (Biddle yard) SB, traverse the layout and wind up back on the same track (now in Alexandria, LA) from where they left.  Next they will drop their train and tie onto the NB string of cars and place their caboose on that train and traverse the layout NB and wind up on the same track from where they left originally in Alexandria.  Lastly they will park the locomotives and caboose back in the engine facility to end the session.

As things progress, I'm sure some things will change, but this is what I have planned as of now.  That's right, there will be no complicated classification switching either.  I want the bulk of the switching focused on the layout, not in the yard.  But by having the crew add their locomotives and caboose to their trains, it should give the feeling of doing some yard work without all the work.

We'll see how this goes...


Monday, October 5, 2020

Brainstorming again...

I'm slowly getting the basement and layout back in order. 

After getting the stuff cleared of the section that is El Dorado, I took a break and got thinking about how this area will be used now with the reduction of the Operations.  In the past this small yard was a bustling place that seen four trains stop here dropping off and picking up cars for the two locals that that were based out of here.  

The unlucky crew that got assigned the El Dorado job was kept very busy throughout the session shuffling cars in and out of the yard for the locals as well as attending to the three industries that are located here.

With the new Ops the entire layout will now only see four trains total pass through El Dorado.  The two through freights and the one local that runs both ways.  The local will drop off cars on the A/D tracks that will be bound for the opposite direction and it will pick them up on the return trip.  The local will still drop off cars for the three industries in El Dorado.

Since the traffic has been reduced, I think I'll reduce the amount of yard tracks as well.  At one point I had planned to have El Dorado proper be raised about 3" between the yard and backdrop and two of the three industries would have been on the raised section.  This meant that there would have been a steep incline with a tight radius loop to reach the industries.  There's always been a burr in my side about this setup, which is one reason why it never got done.

What I plan to do now is to keep everything on the same level as the yard and remove several things so I can get the industries set in place.

I snapped a shot of the existing town and then ran it through my editing software to virtually remove the tracks I have in mind.  




In this edited shot you can see that I removed the loop on the far end that would have been raised to the upper section.  I also removed the one of the four yard tracks and made the third one as a spur to the industry on the far end.  I also removed the caboose track.

In the foreground there used to be two tracks for the local engine facility where the power for the two locals were kept.  I removed one and shortened it up for the spur to serve the second industry.  I'll more than likely move it a little closer the other tracks as well.




This should now leave me with enough room for the two industries as well as road that will run from end to end and connect the two industries.  It should also give me the option to make a town scene with a little more space that won't feel cramped.

So now I have three things to strive for in the future:  I have two locos sitting on the workbench ready for paint that I left them before the remodel began, to completely rebuild the staging yard and now the redesign of El Dorado.  The juices are starting to flow again... 


 

Tuesday, September 15, 2020

One small step...

Ok,

It's been a few months since my last post, but I've been busy with photography and chores around the house.  However the other day when it was raining I got around to digging out all of my train and modeling magazines that I've been holding onto for the 30+ years.  Probably close to 500 of them. Once I kept the few that I wanted (20 or so) the rest went to the recycle container.

I know this doesn't have much to pertain the layout or modeling, but it's something I've been wanting to do for a few years and figured it was a good place to start.

Once I get that area cleaned up, I will be rearranging a few more things so I have a little more room.  Then I'll start clearing off the layout and trying to get things running again.  

I think the first project is to finish the two locos I started to prep for painting just before the remodel began.  After that, I may try to tackle revamping the staging yard.  Plan to strip all the track off and start over with a much smaller yard.

In the meantime here are some pics for proof that I actually got something accomplished.






 

I really do want to be running trains again...

  

Sunday, July 19, 2020

In the year 2020....

In my last post back on December 30th, I explained why I had stepped away from my layout due to a bathroom remodel and wished everyone a happy and prosperous new year.  I guess that didn't happen did it?  2020, what a year so far and we're only half way through it.

After some friendly prodding from some of my modeling friends, I finally made the decision to go back down and try to get started cleaning up the basement and layout.

Back in September I made a trip to Denver to meet some old friends and Op on one of their huge basement layout.  After getting back the remodel got under way and that, unfortunately lasted much longer than I hoped it would have.

We decided it time to update the bathroom, which primarily involved removing the old tub and replacing it with a walk-in shower.  But before we could start, some plumbing issues arose that needed to be fixed first.

The following months seen pretty good progress until it was time to install the plumbing.  The shower head and controls came in and were the wrong models and color, then the toilet (the most important thing) came in the same way, wrong model and color.

The next delay were the cabinets, the builder was running a bit behind so that meant our cabinets were also going to be a bit behind.

By December 18th all the plumbing was installed and working, so life somewhat returned to normal.  By March I had everything wrapped up.

And then the world went crazy...

With all the stuff going on in the world, unlike most other modelers who made the best of the lock down, it just didn't do much for my moral and just left me feeling like "Why bother".  Last fall after the remodel started up I couldn't do much to the layout and it was about that time that I kind of got back into my railfanning and when it took off, it took off.  I spent the from November till now trackside with a new camera and more recently, a drone.  Here's a link to my Flickr page should anyone be interested.

The lull in the basement continued until today.  Maybe it was the hot weather, maybe it was the peer pressure or maybe, just maybe it was the sheer boredom of the moment?  I gathered up some supplies to get after the basement.  But before I get started, I thought I'd snap a few pics of the bathroom and the resulting aftermath of the remodel and what I'm up against.




In the first pic below you can see the new waste line that needed to be installed before the remodel could begin.  The rest are of from around the layout and you can see how how it became the new storage shelves.  The shelves behind the furnace are full of old model railroad magazines that I've collected over the last 30 years or so, they are the first thing that will be attacked and thrown out! 






In this last picture, under the yard throat is the water main.  When the water was shut off the plumber told me it was high time to replace the old shutoff valves (probably original valves from 1952) since he didn't have a good feeling about them and wasn't able to get them to completely stop the water flow.
So now I need to get back in there and clean that mess up along with some minor mold.  Then I can replace the metal shelving and toss more unneeded junk that's been collecting under there.


 
I'm hoping by this fall that things will be back to somewhat normal and I can resume running trains and continue on the scenery.  Providing the Aliens don't show up or world doesn't end next week?








Monday, December 30, 2019

A few months have gone by....

and a new year is almost upon us.

I haven't been posting much lately which is due to the fact that I started a bathroom remodel back in the beginning of October.  In doing so I had to move a lot of stuff in the basement to allow room to have some of the plumbing reworked and things got shove up against and on the layout for the duration.

A few weeks ago the major portion of the remodel work is done and all that's left is to construct the cabinets and get them installed.  This may take a little longer than expected, actually the entire project has taken a bit longer than expected, but that's remodeling for you.

In the meantime I've kind of gotten back into my rail photography since I couldn't get to the layout.
I'm hoping that this helps to regenerate the modeling juices as I still was getting kind of burned out after all the work that I've done on the layout in the first half of 2019.

I still am looking forward to progressing with the scenery and additions to the layout.
So I'll try to get back down there once I wrap up all the work on the bathroom.

Stay tuned...  

I hope everyone enjoys a happy and prosperous New Year!

Friday, October 11, 2019

Repurposed Jewel Cases


Awhile back when I built my first GP18, the GP18 came in one of those long LifeLike jewel cases with a cheap plastic nest that was cracked. I also had one of the typical Atlas rectangular jewel cases with the nice gray foam liner that the GP7 chassis came in.  Since both locos were similar in size, the GP18 with the Atlas chassis dropped right in the Atlas jewel case.

The next one I built, I didn't have a spare Atlas jewel case to use.  So I snooped around on the internet and found some spare cases from a guy on eBay.  I picked up 10 for about $6 each that had the grey foam but they were meant for Atlas RS3’s.  Since the RS3's were smaller I figured some quick cuts with a sharp knife and I could get the GP18 to fit nice and snug?  Worked like a champ!

So after finishing my GP9r I was going to need a jewel case for it as well.  Grabbed one of those cases…



Made a rough trace and using a sharp X-Acto knife I cut those areas out……



 A new foam lined case…


  

Then like I do with all of locos, I labeled the end of the case using a Avery label.  This tells me what loco, what road and what chip I have installed.





Why go to this trouble you ask?
Having all the cases the same size if a plus for stacking or packing, plus the gray foam liner is much nicer than the cheap plastic inserts. 






Sunday, October 6, 2019

Revised Car Tabs

I've really come to enjoy the use of the Car Tabs for car forwarding on my layout, but there were two things that always annoyed to me.  The first was that every time I’d drop one while placing them on the car, they would inevitably fall face down and you had to fumble with them to flip it over.  The second was placing them on empty open hopper cars like my woodchip cars.  The best place to put them was in the bottom of the cars, but since my layout is set at 52” you sometimes had a hard time seeing the tabs.

Recently, a member on a forum I frequent started using tabs and his method was to print his labels on Avery labels and stick them to the “C” channels because he didn’t have a spray booth.  After reading this I thought it might be a simpler method than painting the tabs like I had before.  As I started drawing up the tabs in CorelDraw, I realized that if I used a styrene “I” beam instead of a “C” channel that I could place a label on both sides, then regardless of how it landed you could always see a label. This would take care of my first annoyance.  So I printed up twice as many labels.

Using a 3/16” “I” beam I did a little measuring and came up with a label size that would fit nicely between the webbing and was still big enough to easily read. 









The second annoyance was the tabs for the open hoppers.  I tried using a strip of clear plastic to create a bridge that sat across the car and would allow me to sit the tab on.   While this worked, you had to be careful as it was a little tricky,  when placing the tab it could slip and end up in the bottom of the car, face down.






Now for the empty open hoppers, I was chatting with Greg one night he suggested something using something that would hang over the sides of the cars instead of on top.  What we came up with was to use a strip of Evergreen #258 rectangular tubing and cut off one end of it so it looked like an inverted “U” channel.  This was one of those head-slap moments because it was so obvious. 










   

Monday, September 16, 2019

Rock Island GP9 #4424

After way too many years I finally got around to pulling this project off the shelf to finish it.  N scale has always been lacking in low nosed or chopped nosed GP7's & 9's, luckily Rock Island only had two on their roster.  GP7 #1275 and GP9 #1321.  As far as I know only the 1275 made it through the Capital Rebuilding Program and came out designated as a GP9(r)  #4424 wearing the new Blue & White scheme in December of 1976. 


Rock Island #4424 and #1351 are in charge of the NB local as they throttle up
through Haskell, AR. on a hot, muggy July morning.
  


I did some horse trading with a friend who needed some N scale locos and I need a little kitbashing done in the form of a chopped nosed GP7, the trade was agreed upon and set in motion.  I sent him his locos and all the parts he needed to complete my project:
An Atlas GP7 non dynamic shell
A Lifelike GP18 low nose shell
An Atlas GP7/9 analog chassis
A Digitrax DZ120 chip.
About a year later I received my chopped nose GP7, but was bummed to realize that with the modifications he was unable to give the unit any headlights which meant it would be regulated to a trailing unit only.  So there it sat.... for years.

A few weeks ago while I was rummaging around looking for something to work on, I grabbed the box that held these parts and opened it up to take another look at it and contemplate whether or not I should get started on it?

I took it to the bench to inspect the chassis again for a possible replacement of the old DZ120 with newer DZ126T.  As it happened, I had a newer DCC ready Atlas GP7/9 chassis sitting on the bench in the process of being cleaned and lubed when the light bulb went on!  The GP18 low nosed shell fit the newer chassis with only a tad bit grinding needed on the end to match the slope of the nose, and the "drop-in" DN163A4 with its surface mounted LED's fit with more than enough room.  So the unit would now have headlights! 

With the hard work done for me, I got started adding a few detail parts and then painted it.  I used TruColor paints, Micro Scale Decals and Pan Pastels for weathering.  The grills and fans were darkened with P3 Armor Wash.