Gavilon's Pump House

I finally made a decision as to whether or not I was going to load or unload the tank cars at Gavilon. Since this is a smaller distributor of fertilizer, the tank cars would be unloaded.  With that in mind I added a concrete pad next to the siding with two little boxes where the hoses would attach to.



One red hose one black hose?  The siding will hold two tank cars.  I have four storage tanks, so there will be two types of material that'll be unloaded here.  Two of the tanks will hold one type and the other two will hold another type.  Simple.

For the pump house, I looked at scratch building one, looked at using one of the BLMA utility shed, but couldn't find one.  Then I thought what about an old boxcar?  A 50' car was too big, but a 40' looked pretty decent?

So I started out with a WM version that I found.  Doug M. suggested that I install a personnel door on one side and a roll-up door on the other side instead of using the actual car door to give it some character.  I also added a couple of vents to the top.  



Joe A. said to give the boxcar a coat of paint to suggest that Gavilon has tried to keep it maintained due to the equipment that it housed,  instead of weathering up as if it's about ready to fall apart.  But I wanted it aged.  So I first wore down the logo before I painted it with a gray acrylic and then gave it a White Wash to fade it a bit.






Once painted I tried several methods to give the paint a weather worn appearance.  I finally wound up using a medium stiff paint brush and 70% alcohol to slowly eat through the gray paint.  If you look closely you can see the Western Maryland fireball and reporting marks peeking through.




With this done I can now proceeded with some piping to carry the material from the cars to the pump house, then to the tanks.





Monday, July 22, 2019

OP session #16, 07/20/19

This session was moved up one week due to scheduling issues, a couple of crews were not able to make it due to moving it, which I apologize for.

Several new things happened with this session.  The first thing was fully making use of the new simplified operating scheme, running with a small crew, reduced top speed of the consists and a few guest operators.

To recap the simplified operating scheme, I've done away with all of the trains except the Winnfield Local.  This train does an "out and back" run across the entire layout.  Train #773 is the SB that runs from Little Rock (staging yard) to Alexandria, LA (back to the same staging yard).  Train #774 is the NB train that runs from Alexandria north to Little Rock. 

This one train starts in the staging yard and the train by itself.  The power attaches the caboose to its own train before entering the layout.  This also allows time for the W&OV switcher in Malvern to get the outbound cars gathered up and set out on the interchange track in Haskell for #773. 

Once #773 reaches Alexandria, the crew uses its power to shuffles the caboose to the cars waiting to go north and also attaches any cars that #773 picked up south of El Dorado that need to go back north.  These trains only work trailing point turnouts so no run around maneuvers are needed.  

Not making any Run Around moves has created an interesting operation.  If the SB #773 picks up a white tabbed car that needs to go North, it will pick up that car and drag it south to El Dorado and leave it on one of the A/D tracks for the NB #774 to grab on it's way north.  Any NB White tabbed cars that are picked up south of El Dorado will get drug clear to Alexandria and then be placed on the string of cars waiting to go north on #774.

Train #774 will do the same thing, but in reverse.  Any SB cars that it leaves in El Dorado will be left there for #773 for the next session. 

In time I may schedule two freight trains to run opposite of #773 & #774 (if we have time and extra crews).  If this pans out, then these two trains can and will probably pick up any cars that trains #773 & #774 leaves in El Dorado, thus keeping the length of the locals at a smaller, more manageable length.

As mentioned we only had three crew who were able to make it this time.  Two of us worked the Winnfield local while the third worked Malvern, El Dorado and the ICG interchange.  Even with just three, everything got done and there was even time for the third crew to get his jobs done and kick back and take a nap.

Although we ran out of time as one crew needed to leave, we could have ran the session within the 2-1/2 to 3 hour time frame. Later it was discussed that I should reduce the amount of cars and industries worked during the session.  

Snipped from the email from Joe the next day:
I think the suggestion of turning down the number of cars/industries switched would definitely address the only issues we saw. As it was, it was fun getting to switch so many customers and experience so much of the layout for my first time, and the trains didn't look too long for your layout, but I did feel like we needed to kind of rush to get everything done. If you knocked the number of industries touched per session to maybe 50-60% of what we did yesterday, I think that would give just the right pace, keep the train length reasonable, and let the crew get down and back in just about the right amount of time. It'd probably also offer more operating variety, since some of the smaller industries wouldn't be switched in every session.

The other thing I did was that I reduced the top speed of the locos by lowering the speed curve via the speed table.  

I went from this:



To this:



This kept the top speed down, and made the throttle feel a little more sluggish.  It also prevented any lurching if the knob was spun to far too fast.  This effectively reduced the top speed from 68 down to 35, but as you can see I increased the values of the last four steps much higher, did this so when I clean the wheels they can spin faster. I can warm the locos up quicker or if I get lazy, I can get the locos somewhere faster. So far I'm liking this.

Another thing I may do is to keep two to three locos consisted in the same set.  For a change of pace, I can then swap out the entire consists for a variety instead of individual locos?  This would make matching the speeds a little easier?  I might even try using the advanced consisting method as well?  Although this will require some sort of a ledger sheet so I can keep track of what locos are in each consist and the details of each loco.  Something to ponder...

As mentioned above, we had three crews this time, Quin, myself and Joe Atkinson.
Joe is the CEO of his HO scale Iowa Interstate layout.  It portrays the West End of the IAIS from Atlantic, IA to Council Bluffs, IA. set in May of 2005.
For those of you who have not seen his layout,
This is his site: 
Here's a link to a fellow blogger who captured a lot of nice photos during one of his visits to Joe's layout:

Joe takes pride in modeling this section of the line as prototypically as possible.  It's a beautiful layout.

Now for a few pictures.

Joe's spotting the hopper at Ruston while Quin handles 
the controls of the SB #773 

After entering the yard at Alexandria, they start adding the
NB cars from #773 to #774's train.

Working the NB #774 at DuBach, Joe waits patiently 
while Quin eases the cut onto the Muddy Creek Mill spur.


We had my mother over for a Sunday visit and since we didn't have time to complete the session on Saturday, I had her give me a hand wrapping things up.
Joe and Quin  tied the NB #774 down in El Dorado, so Mother and I finished the run north working the towns of Fordyce and Haskell, then tied down in Little Rock.  After that we moved over to Malvern and pulled the cars left on the interchange track by #774 and spotted them at the industries in Malvern using the W&OV switcher.   Mom did a great job!

Finishing up the work at Gavilon with the #774.

Preparing to tie down the NB #774 at Little Rock.

Pulling the cars off the interchange track at Haskell.

A few fresh loads for Crushmoore Industries.







Friday, July 12, 2019

Big Boy! July 12th, 2019

Was lucky enough to catch the Big Boy today!
We found a spot just East of North Bend, NE  at milepost 48.25

What treat it was to see such an iconic locomotive, something that I never thought I'd ever see running under its own power in my lifetime.

What a treat...







Sunday, July 7, 2019

Super Trees

This afternoon I caught the SB Winnfield local picking up a few bad orders that train #35 left on a siding in Haskell, AR. the previous night.







 I finally got a chance to play around with some SuperTrees.









Monday, July 1, 2019

Static at Gavilon

After getting the grout for the parking lot and ground foam base down at  Gavilon I applied a layer of static grass.  Things are really greening up there now, which shouldn't surprise me as it's a fertilizer distributor? 











Wednesday, June 26, 2019

Gavilon's greening up

I would hope so since they ARE a fertilizer distributor.  

Several years ago I used some grout for the parking lot at Heavy Metal and was pleased at how it looked, much finer than any commercial made gravel.





When I was planning Gavilon I wanted to use grout again, but this time I thought I'd use more of a white color to represent limestone.  I found a good color from Blowes called Frost.  It was almost white and figured I could tone it down with a grayish wash.

Today I got the itch and was able to get the grout down at Gavilon.  It was white that's for sure but was able to tone it down using some gray and brown craft paint that I mixed into a small spritz bottle so I could spray it on rather than brush it on as I was afraid it might not go down even and I'd see the overlay.

Once it dried for a few hours I started adding ground foam for the first layer of weeds.







You can see that it's just a bit Off-White and if you look close you can see where the glue leached into the grout when I glued the weeds in place.  In time I think I'm going to try to play with some weathering powders to highlight different areas where the limestone has sunk into the mud?





Sunday, June 9, 2019

This time I caught the NB Winnfield local #774 at Haskell

After catching the SB #773 at Haskell the other day I caught up with the NB #774 at the same location the following day, but this time it was working at Gavilon Fertilizer and swapping cars on the W&OV interchange track.

Two days, two trains, a good catch in my books!






Tuesday, June 4, 2019

I caught the SB Winnfield local at Haskell, AR

The morning forecast told of more stormy weather headed my way around noonish, so I grabbed my gear and jumped in the truck hoping I could catch up with #773 before the floods came again.

Shortly after grabbing my morning foamer snacks at the local Quicky Mart, I heard'em calling out track warrants for work in Haskell!  Just as I got set up I seen a headlight peeking around the curve as they reached the North end of Haskell siding, perfect timing.  

Todays power consisted of three old Warhorses: two GP18's - #1351 & #1346 and F7 #120.






I took a bit of a break from scenery and got the tracks cleaned up and decided to run a few trains to see how well things worked.  While I was at it I figured it would be a good time to shoot a video and play around with the new editing software I picked up a while back.  

After getting a new computer built last December and installing Win10 I realized much to my dismay that MS had decided not to include their Movie Maker program with this version of Windows.  So I did a little research and picked up the Power Director 17 software.   So far it works better than Movie Maker.