Monday, July 18, 2016

A New Kitchen part 20


Finally!!!!  Light at the end of the proverbial tunnel.

Friday afternoon Jim and knocked off early as he wanted to help me get the Sink base, the Sink upper and the Micro upper installed so I could finish the install over the weekend, it was a big help!

By Sunday night I had all the cabinets installed, countertops installed and then we put the all the shelves in place, the doors on, the drawers inserted.  After that, Lisa got them all wiped down with lemon oil!

I still have a bunch of things to do yet before I can stick a fork in it and call it done, but the majority of the remodel is done!!!!!

Apologize for the crappy cellphone pics.
North wall



West Wall

  

East wall





Things left to do are:
Finish the wiring.
Hook up the plumbing.
Get the base and casing installed.
Install the tile backsplash.

These are waiting for the subs to get the time in their schedules. 

The last thing will be to lay the flooring.  I'm planning to install a Luxurious Vinyl Plank flooring and cover up that ugly yellow flooring!  Then I can get the appliances set into place and enjoy the new kitchen.


Jump to A New Kitchen pt 21

7 comments:

  1. Is it just me or did you post this three times?

    ReplyDelete
  2. Nice job Allen! I know you will be glad when it is 100% done and can go back to playing with trains.

    ReplyDelete
  3. Been off the air for a while Allen. new Kitchen is coming along very nicely.
    Regards
    Rod.

    ReplyDelete