Re-alignment at Tioga Jct.

Since I reduced my Ops plan several years ago, the short siding at Tioga Jct. near Winnfield has no use any longer.

Back when I had two locals that worked North and South out of El Dorado, the South local would work Union Scrap in Winnfield, which it usually only needed a couple of gondolas.

Since there wasn't very much room there and only that short siding, the local would leave most of its cars sitting in Dubach and drag down only the few gons needed.  Once it worked Union Scrap, the power would run around the loaded gons and return to Dubach, grab the rest of its train and make its way back to El Dorado.

Now only the NB local works Union Scrap and it's a trailing point switch, so no run around is needed.  So the other night I called out the track gangs and I had them remove the siding and realign the tracks at the junction.

This is what I started with:


Here's a quick video of how I reworked it.

 