With 3D printing hot and heavy these days, I'm still learning the old school ways I guess?
I got the Pike Stuff kit assembled and then started working on the middle building which I used sections of the DPM modular wall sections last night. I dug through my styrene stash and first added a lip to support the roof section, then I kept working on it so it would be self supporting. It might be a little overkill, but it should stand up for the long haul.
I also got the concrete pad finished up. Since I didn't have any 0.060" styrene on hand, I used plain 0.030" sheets and with my homemade Dupli Cutter, I scored 10' squares. After gluing two sheets together, I added a lip around the edges to make 0.060" so it sets up against the ties, but below the railhead.
Kit bashing is definitely not as easy as kit building, but at the same time it provides one with a challenge. This is something that I'm going to need to learn from as I have a lot of kitbashing for the layout.



No comments:
Post a Comment