I started installing the signals for the Iowa Scaled Engineering IIAB (Interlocking in a Box) today.
The holes for the signal wires needed to be a bit bigger to allow for the plug on the Atlas Type G signals. The bases of the signals are not very wide and did not quite cover up the holes, so a friend told me to add a piece of thin styrene under the bases to hold the signals and cover the holes.
After sizing the styrene a bit bigger than needed, I drilled a hole for the wires and cut a slit so I could slide it under the base. I then glued it to the bottom of the signal base with MEK. I also decided to drill four holes, one in each corner to allow for Atlas track nails, these will hold the base in place, but lose enough that if I bump them, there will be some give.
I think they are a little taller, but not by much.
I placed them about 10" from the diamond, the one on the left kind of set the placement due to the house track siding, but I think this will still be ok.
No comments:
Post a Comment