Today I got the static grass applied to both sides of the track that runs behind the bog so that I could finally start planting some trees against the backdrop. Wanted to get these in before I started working on the trees that’ll be in the foreground.
Luckily I had enough trees left over from the Whitewater Creek scene to cover the majority of the area. With a lot of open spaces between the larger trees, I started filling in with some leftover Super Tree pieces that I removed while planting them.
That still left a lot of open area space at the base so I started making some brambles and will eventually work in some smaller vegetation and some poly fiber bushes to give the tree base a fuller, thicker look.
No comments:
Post a Comment